MEAssure
Takeoff, estimating and commercial assurance

From drawings to commercial confidence.

Measure on the drawing, price with the rate’s evidence beside it, and see exactly what each new revision moves. Every figure in the estimate leads back to the outline and the rate behind it.

See a figure traced →

Everything shown is MEAssure’s own output on a synthetic test drawing, with synthetic rates in USD. No customer data.

Then revision B arrives

From the signed record of rev A to the current estimate, explained by cause and reconciled to the cent.

USD 7,139.62 → 7,327.31+187.69
  • Geometry+0.14
  • Deletions−450.00
  • Additions priced+450.00
  • Finish changes+262.88
  • Formulas and lines0.00
  • Rates+150.00
  • Line references−225.33

✓ The seven causes sum exactly to the difference of the two recorded totals.

A-101 Guestroom floor plan · rev AScale 1:100, confirmed4 rooms accepted
37.5547 m²37.5547 m²37.5547 m²37.5547 m²

Line 09 68 13 · Carpet

USD3,755.47
Quantity
MeasuredArea() = 150.2188 m², rooms 101–104
Finish
Carpet, from the room finish schedule
Rate
25.00 per m², typed with its reason recorded
Total
150.2188 × 25.00 = 3,755.47 exactly
Rendered from the product: the drawing as stored, the outlines as measured and the line as the engine priced it. The sheet is marked “SYNTHETIC: B7 demonstration drawing, not a real project”.

The drawing is the proof

Open any figure and walk it back: the total to its quantity and rate, the quantity to its measured outlines, the outlines to the drawing and revision they were measured on.

  1. DrawingA-101 rev AStored with its SHA-256; scale 1:100 confirmed by the estimator
  2. Measurements4 rooms101–104, each 37.5547 m², accepted
  3. Quantity150.2188 m²MeasuredArea(), 4 decimal places, half up
  4. Rate25.00 /m²Typed with its reason recorded; or from a library or build-up version
  5. Total3,755.47Quantity × rate to the cent, half up
  6. RecordSigned receiptEstimate total 7,139.62. A record of the calculation, not an issued estimate

See it work, in six steps

From the drawing to the revision, on one synthetic floor. Play it, pause it or step through it.

A-101 Guestroom floor plan · rev AScale 1:100, confirmed
37.5547 m²37.5547 m²37.5547 m²37.5547 m²
Step 1 of 6 · Takeoff

A drawing arrives

Sheet A-101, revision A, is registered with its file’s SHA-256 and confirmed at 1:100.

Available

CSS and SVG only. The arrow keys change step; choosing a step pauses. MEAssure’s output on the synthetic test set; rates synthetic, in USD.

Rates with their evidence

A rate is never a bare number. It comes from an authorised library row or a published build-up version, or it is typed with its reason. Each shows where it came from wherever it is used.

Build-up: carpet tile, laid

Another synthetic project: version 1, per m², USD. Material waste is in the use.

Resources of the carpet tile build-up, per m²
ResourceUse per m²RateCost per m²
Carpet tile · material1.05 m² (1 m² + 5 % waste)30.0031.50
Tile adhesive · material0.315 kg (0.3 kg + 5 % waste)4.001.26
Floor layer · labour1 hr per 6 m²40.006.6667
Tile cutter hire · plant1 day per 120 m²36.000.30

Direct cost 39.7267 (exactly 119.18 ÷ 3) × 1.10 for 10 % overhead × 1.05 for 5 % profit = 45.8843 exactly, applied at 45.88 (2 places, half up). The guest room’s 11.2007 m² × 45.88 = 513.89.

Quantities you can rely on

How a quantity enters the estimate, and how it is marked.

  • From measured outlines and formulas over them, calculated by the engine.
  • Typed, when there is nothing to measure: allowed only with its reason, and marked typed everywhere it appears.
  • Draft measurements can be priced early to see their effect. They stay marked provisional until reviewed.
  • Review and formal issue are separate, recorded steps. The issue is held while any quantity is provisional.

What a revision moves, and what it does not yet

MEAssure pairs the measurements of two issues and proposes the cost movement. It says plainly which parts are approved, which are provisional, and what is not priced at all.

  • Approved movementCommitted by the estimator after review, such as the deletion of door D08 and the finish change of room 104.
  • Provisional pricingPriced from a measurement still awaiting review (partition P2): shown, never an approved commercial amount.
  • Unpriced additionNew door D05 on rev B: listed as unpriced and unresolved, never counted as zero.
  • Excluded from scopeThe store, 10.6730 m², excluded with a recorded reason; not priced.

Revision comparison is in Beta. A signed receipt is a record of one estimate at one moment, not an issued estimate package.

What is available today

Available
  • Drawing register and intake
  • Scale calibration and drawing checks
  • Takeoff with manual correction
  • Finish schedule evidence
  • Structured bill of quantities
  • Rate libraries and build-ups
  • Review and draft Excel export
  • Signed calculation record
Beta
  • Revision comparison and reviewed changes
  • Method-of-measurement checks, advisory

The checks cover four NRM2 and SMM7 rules and list what they could not evaluate. They are not a compliance certification.

Concept, not available
  • Ask MEA, the assistant: switched off until it passes its own evaluation
  • Elemental cost planning and benchmarks
  • Tender comparison